Defense contractors on Deltek Costpoint need reimbursement software that maps directly to project IDs, org codes, and charge codes without manual re-entry. Vergo's Costpoint integration syncs approved reimbursements natively to the job-cost structure, supporting DCAA audit trails at the transaction level. This eliminates compliance gaps that arise when expense tools operate outside the ERP.
Defense contractors face reimbursement challenges that commercial builders never encounter. Every expense must tie to an allowable cost category under FAR/DCAA guidelines. When reimbursement tools don't speak Costpoint's language, controllers spend hours manually re-coding expenses across projects, task orders, and org IDs.
Disconnected reimbursement workflows create real risk:
Finance teams at defense firms need reimbursements that map natively to Costpoint's project-task-org structure.
Vergo is a card-agnostic expense management platform built for construction. Connect any corporate or project credit card and get full visibility and control over field spending.
Yes. Vergo integrates natively with Deltek Costpoint, syncing project IDs, task orders, org structures, and cost-type codes. Approved reimbursements post directly to the Costpoint general ledger without manual re-entry, reducing coding errors and saving finance teams hours of reconciliation each month.
Vergo maintains immutable, timestamped audit trails for every reimbursement submission, edit, and approval. It validates expenses against allowable and unallowable cost categories before they reach the general ledger. These controls support DCAA incurred-cost audit requirements and help defense contractors avoid compliance findings.
Yes. Vergo offers mobile receipt capture so field engineers, site managers, and traveling staff can photograph receipts and submit reimbursements on-site. The app pulls active Costpoint charge codes so expenses are job-cost coded at submission, eliminating back-office rework by controllers or AP clerks.
Vergo routes reimbursements through configurable approval chains based on dollar thresholds, cost type, and project assignment. Typical flows include project manager review, contract administrator verification, and controller final approval. Each step is logged with timestamps to maintain a complete audit trail for compliance.
Defense contractors must comply with FAR and DCAA rules that require every reimbursed expense to be classified as allowable or unallowable and tied to a specific contract, task order, and cost type. Commercial firms rarely face this level of cost-accounting scrutiny, making generic expense tools insufficient.